![]() |
||
|
|
|
|
WORK EXPERIENCE
PLANT ENGINEER Improve reliability of packaging, conveyor, and process equipment. Primary troubleshooting responsibility for complex failures. Root Cause Analysis and Preventative Maintenance. Troubleshoot/Repair PLC based slicers, conveyor systems, and high speed packaging equipment. Initiate, Coordinate, and Track Plant-wide capital projects and upgrades. Prioritize potential projects based on business continuity requirements and ROI. Facilitate projects with internal Maintenance function, in concert with outside resources. Actively manage on-site projects including significant Utility, Structural, and Electrical upgrades and repairs utilizing Microsoft Project. Managed and Updated Plant and Equipment utilizing AutoCAD Resources. Direct liaison between Ownership, Internal, and External Resources for New Equipment, Capital Projects, and Upgrades. Work with structural, equipment, utility drawings, and process specifications. Award project bids based on developed criteria specifications. Primary troubleshooting contact for outside technical services to ensure plant operation. Create operational specifications and interview potential vendors for barcode, labeling, conveyor, and Warehouse Management system installation and implementation Carolina Pride Foods Inc., Greenwood, South Carolina, March 2007 to Present.
OPERATIONS MANAGER Leader of all aspects of operations and business including P/L, facilities, maintenance, marketing, finance, legal requirements, EPA, safety, human resource management, customer service, advertising, and web site design and development. Work force optimization, scheduling and productivity planning. Provided leadership and development for 30+ employees. Developed business tracking and monitoring processes. Developed Business Plan, Marketing Plan, and Competitor Analysis. Atlanta, Georgia June 2005 to January 2007.
ABBOTT LABORATORIES INSTRUMENT & CALIBRATION SERVICES MANAGER Responsible for budget totaling over 7.8MM, and (70) maintenance employees. Managed building projects, upgrades, and procedural upgrades of divisional and departmental polices. Primary interface for Abbott Park with FDA, TGA, and EU agencies for Maintenance, Calibration, and Metrology issues. Long-range Planning, budgeting, management of capital, expense, and sales budgets. P/L system trained. Member of the calibration Validation Review Board (VRB). Instrumental in creating compliant plant-wide procedures for equipment repair and calibration. Developed a very strong partnership with Engineering. Supported and managed Instrumentation and Controls. Provide strategic and tactical direction. Responsible for 32M PM and calibrations per year and PM and maintenance of 1800 Abbott Manufactured Instruments. Developed the Leadership Curriculum for LC I&CS. Mentor and coach for (9) supervisory personnel. Managed contractors and temporary employees. CAPA trained. Personal availability 24 hours per day, 365 days. Abbott Laboratories, N. Chicago, IL, 2001 to June 2005. Specific Training: Advanced Program for Managers (4 day off-site), Supervision Through People Skills (3 day), Set Vision and Strategy, Driving for Results in an Innovative Organization, and Leading in a Changing Environment.
|